Header menu link for other important links
X
Reliability and delay analysis of slotted anycast multi-hop wireless networks targeting dense traffic iot applications
Yerra R.V.P., Pachamuthu R.,
Published in Institute of Electrical and Electronics Engineers Inc.
2015
Volume: 19
   
Issue: 5
Pages: 727 - 730
Abstract
Studies on IEEE 802.15.4 MAC in the current literature for anycast multi-hop networks do not capture a node's behaviour accurately. Due to the inaccurate modeling of state-wise behaviour of a node, the optimization of network parameters has not been efficient so far. In this work, we include the state-wise behaviour of a relay node into a 3D Markov model to more accurately investigate the protocol performance. Performance analysis of the proposed analytical model is evaluated for different variants of active state length, packet length and wake up rates considering reliability and delay as key performance metrics. Performance analysis shows that the model captures the behaviour of relay nodes most accurately. © 1997-2012 IEEE.
About the journal
JournalData powered by SciSpaceIEEE Communications Letters
PublisherData powered by SciSpaceInstitute of Electrical and Electronics Engineers Inc.
ISSN10897798
Open AccessNo